Province | Subbasin | % |
---|---|---|
Columbia Cascade | Entiat | 25.00% |
Methow | 25.00% | |
Okanogan | 25.00% | |
Wenatchee | 25.00% |
Previous: | Next: |
---|---|
74314 REL 145: 2010-001-00 EXP IPID - SCREEN MATERIALS, FABRICATION AND INSTALL |
|
* Expenditures data includes accruals and are based on data through 30-Nov-2024.
Deliverable Title | WSE Sort Letter, Number, Title | Start | End | Concluded |
---|---|---|---|---|
Documentation and assistance to support BPA's EC group | A: 165. Obtain Required Permits, Authorizations, and Documentation | 09/27/2023 | 09/27/2023 | |
Effective implementation management and timely contract administration | B: 119. Manage BPA Contracting Requirements | 09/27/2023 | 09/27/2023 | |
Effective and regular communication | C: 191. Coordinate with regional and local project partners including the CCT, MSRF, & UCSRB | 09/27/2023 | 09/27/2023 | |
Create two plunge pools and install, if necessary, the restrictor plate | E: 208. Buttermilk fish conveyance improvements | 12/30/2022 | 12/30/2022 | |
60% Designs completed | F: 175. 60% Design for Maltais screen and roughened channel | 09/27/2023 | 09/27/2023 | |
60% Designs complete | G: 175. 60% Design for Twisp Power Facility | 09/27/2023 | 09/27/2023 | |
60% design complete | H: 175. 60% Design for MVID East | 09/27/2023 | 09/27/2023 | |
60% Design complete | I: 175. 60% Design For Tandy | 09/27/2023 | 09/27/2023 | |
60% Designs complete | J: 175. 60% Design for Skyline | 09/27/2023 | 09/27/2023 | |
Mapped List of Diversion in the Rocky Reach Pool | K: 115. Rocky Reach Pool Pump Screen Inventory and Assessment | 09/27/2023 | 09/27/2023 |
Primary Focal Species | Work Statement Elements |
---|---|
Chinook (Oncorhynchus tshawytscha) - All Populations |
|
Steelhead (Oncorhynchus mykiss) - All Populations |
|
Sort | WE ID | WE Title | NEPA | NOAA | USFWS | NHPA | Has Provisions | Inadvertent Discovery | Completed |
---|---|---|---|---|---|---|---|---|---|
A | 165 | Obtain Required Permits, Authorizations, and Documentation | |||||||
B | 119 | Manage BPA Contracting Requirements | |||||||
C | 191 | Coordinate with regional and local project partners including the CCT, MSRF, & UCSRB | |||||||
D | 185 | Periodic Status Reports for BPA | |||||||
E | 208 | Buttermilk fish conveyance improvements | 08/30/2023 | ||||||
F | 175 | 60% Design for Maltais screen and roughened channel | 08/30/2023 | ||||||
G | 175 | 60% Design for Twisp Power Facility | 08/30/2023 | ||||||
H | 175 | 60% Design for MVID East | 08/30/2023 | ||||||
I | 175 | 60% Design For Tandy | 08/30/2023 | ||||||
J | 175 | 60% Design for Skyline | 08/30/2023 | ||||||
K | 115 | Rocky Reach Pool Pump Screen Inventory and Assessment | 08/30/2023 | ||||||
L | 132 | No Report to BPA Required per COR -- Summary to UCSRB |